Workflow

A unit of work groups artifact changes around one deliverable outcome. Each artifact retains one active change. The coordinator records shared scope, participating changes, acceptance criteria, and combined validation evidence in a unit brief; owning artifacts retain their detailed knowledge. Each phase finishes and validates its output before the next phase consumes it. Corrections remain in the same change.

Roles and Phase Gates​

PhaseOwnerComplete when
RequirementProduct Owner (PO)The need, scope, acceptance criteria, and potentially affected artifacts are clear. No unresolved blockers prevent Specification.
SpecificationTechnical Lead (TL)Behavior and all applicable interface contracts are defined. Necessary ADRs are recorded, dependency impact analysis is complete, and no blockers prevent Plan.
PlanTechnical LeadTasks cover the required work, reference governing knowledge, identify dependencies and parallel implementation opportunities, and contain concrete DoD checks. No blockers prevent Implementation planning.
ImplementationAssigned implementers, coordinated by one implementation coordinatorRequired tasks satisfy their DoD and combined implementation passes integration and dependency validation.
VersionImplementation coordinator prepares; team reviews and mergesChecks pass, the version number is computed from the confirmed compatibility level, and the version record and identity record agree. Establishment requires all required changes to land on main or master.

The coordinator can be the TL or a designated implementer. This is an assigned responsibility; it does not require another agent session.

Change Tiers​

The coordinator assigns each change a tier at Requirement: small, medium or large. Every tier has all five phases. A small change keeps each phase short, commits Requirement, Specification and Plan together, and its plan approval is the owner's request. A medium or large change commits each phase and waits for explicit plan approval. The tier guide lists the small-tier criteria, the records and gates of each tier, and the guarantees that hold for all tiers.

Change Lifecycle​

  1. Start the change on a dedicated branch. Add changes/<change>/README.md. Copy nothing. Edit working knowledge in place: retain, amend, remove and add.
  2. Complete Requirement, Specification and Plan with their self-checks. Commit each phase for a medium or large change; commit the three phases together for a small change. Record self_check where readers need it.
  3. For a medium or large change, present the plan and wait for explicit approval; the approval also confirms the compatibility level. For a small change, the owner's request is the approval and the plan goes in the PR description. Implementation records evidence in tasks.
  4. Prepare the version: compute the number from the confirmed level and current_version on the protected branch, add versions/<version>/README.md with source_change, set current_version and any changed depends_on in the identity record, and open the PR.
  5. The version is established when the PR lands on the protected branch. The change directory remains as the retained delivery record.

A change that stops before merge leaves no record on the protected branch, because its knowledge exists only on its branch. Withdrawal closes its PR with the reason; the branch stays until the owner allows its removal. A paused change stays the active change of its artifact; the owner withdraws it before another change of the artifact starts. When a unit brief on the protected branch names a withdrawn change, the next PR of the unit removes the member and records the reason in the excluded scope.

A reversal of an established version is a new change. Its requirement names the version and the reason. It edits knowledge and code in place, and keeps the reversed version record and its change directory unchanged. Its level follows the effect on consumers of the current version. Its number is computed from current_version like every number, so version numbers never decrease.

The runbooks give the steps for these cases and for other recurring situations. The artifact model defines the records. For an artifact in the legacy layout, the change starts from a copy of the current version knowledge and the version is a complete copy of the resulting knowledge.

Requirement​

The PO authors and validates the requirements, then performs a self-check before handing them to the TL. No separate reviewer or approval step is required.

Record the reason and scope of the change in its change record. Edit requirements in place: retain applicable requirements and add, amend, or remove requirements as needed. Identify potentially affected artifacts for dependency impact analysis.

Specification and Plan​

The TL defines precise behavior and contracts from the completed requirements. Requirements own the need and desired outcomes; specifications own detailed behavior and interfaces; ADRs own architectural choices and their reasons.

Cover all applicable interfaces, including APIs, events, data formats, error behavior, and operational interactions. Create an ADR only for a necessary architectural decision with multiple options. Complete impact analysis throughout Requirement and Specification.

For AI-assisted work, use a frontier model for Specification and then Plan in the same session. Self-check each phase before advancing. Preserve the phase gates even when one actor performs both roles. A separate planning agent or fresh-session review is not mandatory.

The plan produces tasks/README.md and task files. Each task records its scope, implementation location, the requirement IDs that it covers, dependencies, and DoD checks. The plan proposes the compatibility level. Identify which tasks can run in parallel across applications, services, or repositories. For a medium or large change, present the completed plan and wait for explicit user approval before Implementation. A new plan or material change requires renewed approval. For a small change, the owner's request is the approval.

Implementation​

Each assigned developer or AI agent implements a task, adds or updates tests, runs its DoD checks, and records evidence in the task. Parallel tasks must respect their dependencies and established contracts.

The coordinator validates the combined implementation and handles failures across task boundaries. Dependent Implementation begins only after required upstream changes establish their versions and the prepared specifications and plan are rechecked against them.

Shared Outcome Validation​

Validate each member's task DoD and the combined outcome. Completion requires all participating changes to produce established versions, evidence supporting every shared acceptance criterion, and passing required integration checks. Record combined checks in the unit brief; reference delivered task evidence where sufficient. Checked tasks and phase inference alone do not prove establishment or approval.

Dependent implementation still waits for required upstream establishment, even when both artifacts belong to the same unit. Preparing a unit does not bypass the plan approval or team merge gates. Historical completion uses delivered versions and their linked originating delivery records rather than later current versions. New version records name source_change and contain no tasks; retain the originating change and verify publication before using its evidence. Missing knowledge or merge evidence remains unresolved.

Use evidence records and reconciliation within these existing checks. Reconcile a stale declaration from required merge and protected-ref evidence; keep failed validation distinct from merged publication.

Corrections​

ProblemReturn to
Requirement ambiguity or missing business ruleRequirement; the PO revises, self-checks, and commits the output before handoff.
Contract or architectural gapSpecification; the TL revises the design and impact analysis, then updates Plan.
Missing or incorrect implementation taskPlan; the TL amends and self-checks the plan.
Code or test defectImplementation; the implementer fixes and repeats relevant checks.

Pause affected downstream work while its governing input is corrected. A material amendment after plan approval needs approval again; the material test decides. Repeat affected phase checks before resuming; retain unaffected work that remains valid.

Commits and Team Review​

For a medium or large change, each completed phase produces a commit containing its output. A small change has one knowledge commit for Requirement, Specification and Plan. Corrections also produce commits. In projects spanning repositories, commit the relevant outputs in their owning repositories.

Commit each phase on a dedicated branch. Never commit directly to protected branches such as main or master. When remotes exist, push change branches and open one PR per changed repository, cross-linking companion PRs. Always stop for the team to review and merge. If no remote exists, ask the user how to finish; do not assume remote creation or local integration.

Plan approval is a required user gate before Implementation: explicit for a medium or large change, the owner's request for a small change. Team PR review and merge establish the version after validation for every tier. Neither requires redundant agent reviews; phase self-checks and implementation validation remain required.

Flow maintenance in existing phases​

Use the system-flow format within existing phase self-checks. Requirement investigates candidate journeys, owners, and supporting elements before asking for discoverable facts. Specification updates affected steps, branches, contracts, support records, and gaps, and checks compatibility. Plan supplies fresh implementation tasks and concrete flow validation. Implementation compares behavior with the prepared flow knowledge; new requirement or contract facts return to their owning phase. Version preparation checks final references and retains originating evidence.

The coordinator records affected-flow declarations and discovery scope in the unit brief. A flow can be new or not yet documented; its absence does not prevent unit creation. Do not add a review phase, approval shortcut, or workflow state registry.